Test project FMF 15 May 2026
Complex SW СУСТАВЫ - product landing
- Astro 6
- Tailwind 4
- Decap CMS
Product landing built pixel-faithful from a Figma file. Astro 6 islands and Tailwind 4, with copy editable through Decap CMS.
Test project FMF 15 May 2026
Product landing built pixel-faithful from a Figma file. Astro 6 islands and Tailwind 4, with copy editable through Decap CMS.